Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1077

Allow Bulk Change to Issues/Form Entries

We require the ability to Relate issues/form entries and link to Project Documents in bulk within ProjectWise connect, using the tick box function. The tick box currently only allows to bulk change state or assign to a user.
about 1 year ago in Infrastructure Cloud / Issues 0 Future consideration

ProjectWise Deliverables Management – Additional Reviewers Shown As Recipients

PW = ProjectWise DM = Deliverables Management We use PW DM for document review, markup, actions and action tracking. With the PW DM distribution matrix, our process is that we add Additional Reviewers (AR), extra to the Reviewer (R). See attached ...
almost 2 years ago in Deliverables Management 1 Future consideration

delegate transmission

We are working with project that span over several years. We also have a project starter team Which lead to sending lots of transmission to people who will move away form the project.
about 2 months ago in Deliverables Management 1 Future consideration

Custom folder and catagory tag (Multiple BOM)

We see a global trend to use category or tags to qualify documents in replacement of the typical folders. We can see this under ProjectWise Manage Portfolio Mulitple WBS https://youtu.be/39DDFyTi7ms?si=GpiWj-g0SMF6p-LG&t=1453 Request is to mer...
about 2 months ago in ProjectWise Design Integration 0 Needs review

ProjectWise Messaging Service HTML Format

The ProjectWise Messaging service should allow for HTML emails, so ProjectWise links can be generated within the email body. Currently the plain text emails have very limited usage.
about 1 year ago in ProjectWise Design Integration 0 Needs review

Preview CAD files on PW Web

It would be good to be able to preview CAD files within PW web. This would save users time.
over 1 year ago in ProjectWise Web & View 0 Needs review

Item Type Import ProjectWise Integration

Currently, when working in ProjectWise (PW), Importing Item Types doesn't open PW dialog for selection of an Excel file to import and instead normal non-ProjectWise dialog opens. This functionality needs extended to PW dialog. It is reasonable to ...
9 months ago in ProjectWise Design Integration 0 Needs review

Daily report on any updates/deletes and addition of new documents across the storage areas

We would like to have a report that has instanceID (GUID) of an object and a change-log details such as updates/deletes or new object. We would like to track the changes at the meta data level and extract the document to analyze. Currently we know...
7 months ago in ProjectWise Design Integration 0 Needs review

Design Task Email Notifications

When sending assigning a design task to an individual the email notification says that an ISSUE has been assigned to the recipient. For clarity the email notifications should reflect the item type that is being assigned. For instance a Design Task...
about 1 year ago in Infrastructure Cloud / Design Task 0 Planned

Prevent managed workspace from pulling previous workspace file versions

When working with a managed workspace, if you have versions of files in the workspace, the wizard will copy out all versions of a workspace file, this bloats workspace sizes and copy out times which forces you to not version workspace files in PW,...
7 months ago in ProjectWise Design Integration 0 Needs review