Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

ProjectWise Design Integration

Showing 541 of 1428

Color-Coded Form Lines Based on Status

The goal is that each line in the list of forms to have the color for identified the status.
over 1 year ago in ProjectWise Design Integration 0 Needs review

Backmasking to apply to element 'text node' in interplot service as well as element 'text'

When leveraging the iCS (interplot) service, background masking is not being honoured on the element type "Text Node". Element type "Text" works as expected. The reason that text nodes are being used is that when the user applies a field to a text...
over 1 year ago in ProjectWise Design Integration 0 Needs review

PW Description field is too short at 127 characters

On behalf of Tim Zahn at Shell QGC (originally CS0003060): We have been informed that the ProjectWise Description field is limited to 127 characters, whereas the ALIM Title field is 255 characters. The ALIM-PW connector does not truncate the Title...
over 1 year ago in ProjectWise Design Integration 0 Needs review

Update documentation with all firewall rules

The installation documentation calls out how the PWDI installer adds local firewall rules for the ProjectWise ports 5799 and 5800, but does not mention anything about file and printer sharing ports (various smb, netbios, etc ports), which are a re...
over 2 years ago in ProjectWise Design Integration 0 Needs review

Retrieve property from a Specific Work Area Type (WAT)

We have different Work Area Type (WAT), each having a specific name and specific properties. When we set and attributes to retrieve a WAT properties, we are not able to to retrieve by WAT name Example I have WAT-Project WAT-Discipline No matter wh...
over 2 years ago in ProjectWise Design Integration 1 Needs review

Requirements management and change management

Request is to embed requirements management to ProjectWise Design Integration along wth change management. https://www.youtube.com/watch?v=By90bNBMT54 https://youtu.be/Vjfdax3Laus?si=NmWEogfJuWNWsnUz&t=48
over 2 years ago in ProjectWise Design Integration 3 Needs review

Enable Interface change-Advance Wizard

Once we launch the advanced Wizard, we are not able not able to change the interface to capture more attributes at the document creation. Request is to allow Interface change. In the attach, the wrong interface show and we are not able to enter do...
over 2 years ago in ProjectWise Design Integration 1 Needs review

Selectable connected project association (web or P365)

When you go to associate/create a connected project inside of Pwise you are allowed to create a new one however it is only for ProjectWise WEB, there needs to be a way to select P365 which is a much more useful system then the limited WEB, without...
over 2 years ago in ProjectWise Design Integration 0 Needs review

Search with date range between

We would like to create a save search between a day range Example: All documents update between -7days and -14days this way we will see only the documents update the week before. The idea behind is to avoid having overlap between -7 days and -14 d...
over 1 year ago in ProjectWise Design Integration 1 Needs review

Managed Workspace: Exclude from CopyOut as variable

There are many situation where it is preferred not to copyout content, but this may very by workspace, project or even user. Example: ICS for PDF only need fonts, etc from a managed workspace. A CSB could be setup an applied to the ICS user with t...
over 4 years ago in ProjectWise Design Integration 0 Future consideration