Incorrect order that the right click / send to mail recipient option generates
In BIM4NR, When selecting a group of files, and then using the right click / send to mail recipient function; the generated results do not display the selected files in the same order as on Screen. If the order of the files is important (such as for the H&S file Save Search report), this has to be manually changed by the user to match the copy list to clipboard / Paste to Excel document order displayed. The order of this Send to email Function can be very important when collating information from other sources, using the right click – copy list to clipboard ProjectWise function or if a tracking sheet is being produced etc. The selection in ProjectWise on the left starts with NR A0 Frame Landscape.dgn, on the right, the email starts with NR3+18 Frame Landscape.dgn (send to mail recipient as link) Reason for request is To remove the need to check whether the links are in the right order, and the time to re-arrange the links into the correct order, as selected originally. Getting this to display in the correct order would save a lot of manual time consuming and frustrating checks, and would help to avoid mistakes or mis-matches of information.