Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

ProjectWise 365

Showing 187

Ability to filter projects to differentiate ProjectWise 365 and Infrastructure Cloud projects

We have some projects in ProjectWise 365 and some in Infrastructure cloud. We need to be able to see a consolidated list of ProjectWise 365 projects and Infrastructure Cloud Projects.
about 1 month ago in ProjectWise 365 / Issues 0 Needs review

Share Read-Only link to folder in a connected project with external user, non-team member

Ability to share a read-only and or Edit enabled link with external user not part of the connected project team, (enabled in both ProjectWise 365 and/or Infrastructure Cloud). Similar functionality as in Microsoft OneDrive or SharePoint. Currently...
about 1 month ago in ProjectWise 365 / Issues 1 Needs review

Please include customized roles (manage roles) in InfrastructureCloud

Please include the option to customize roles (manage roles) under 'Manage your team', so that users can be divided into subdiscipline roles such as 'Civil' 'drainage' 'road' - it was possible in PW365 but not in infrastructure cloud (yet).
4 months ago in ProjectWise 365 / Administration 1 Planned

BIC - iModel copy measurement result values

If you create a measurement you receive the values in a properties menu. But you are not able to copy the values as it is possible for object properties. It would be helpful to have this copy option (rightklick) also for values of measurements.
4 months ago in ProjectWise 365 / 3D Design Reviews 0 Needs review

ProjectWise 365 + Microsoft Teams Integration with iTwin

Looking at the MS Teams integration with iTwin, as this would be a great addition to allow project teams easier access to the platform. the Microsoft Teams application was developed back in the days when iTwin was not part of Projectwise it would ...
12 months ago in ProjectWise 365 / 3D Design Reviews 0 Needs review

Transition Buttons behavior that have Required Conditions

in forms, each transition button can have a conditions that has to be met to use it. If a user selects the option then they get an error message that may not be intuitive. Can only transition buttons show up where the condition is met, or a button...
4 months ago in ProjectWise 365 / Issues 0 Future consideration

Method to Order or Prioritize Transition Buttons

In forms, the workflow transition buttons are listed by how they were created. is there a way a sort property can be added so they show up in a priortized order.
4 months ago in ProjectWise 365 / Issues 0 Needs review

Make Transition Buttons same size

In form workflow there are multiple valid options. Only 1 option is shown in full size then the others available are small when clicking the dropdown arrow. Users sometimes see these are not primary valid options due to the way they are presented....
4 months ago in ProjectWise 365 / Issues 0 Needs review

Enable the ability to enter comments to annotations on PDF files without the need of creating an issue

Enable the ability to enter comments to annotations on PDF files without the need of creating an issue
3 months ago in ProjectWise 365 / Design Review 1 Planned

Customer experience on PWDM interface for Connecting Projects

Invite links will prompt user to select "Accept" with highlighted tab which is often not the case especially for CAG's T5 project which connects with numerous consultants on many projects that requires them to go to "Advance Options" instead! PLEA...
15 days ago in ProjectWise 365 / Issues 1 Needs review