Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1070

go to folder in het Attach Reference Dialog

I want to link a drawing but don't know the folder name. I do know another file in this folder and I look it up. If I have the results , then I need the "Go to folder" button of the file I have found , so that I can select the other drawing..
14 days ago in ProjectWise Design Integration 0 Needs review

Granular Security Read Access to nodes

With Granular Access enabled currently the only option is to have Full Control, Change Permissions, or Change Settings. Is there a way to add Read Access? This would be extremally helpful for allowing certain users to see User List membership whil...
9 months ago in ProjectWise Design Integration 0 Needs review

Simplify Bentley's Cloud platforms

Bentley Infrastructure Cloud Bentley iTwin Platform Bentley PlantSight Bentley Synchro Bentley ProjectWise All of the above platforms, do a small piece of different functions all based on Bentley Cloud offering. These shall be simplified for the u...
27 days ago in ProjectWise 365 0 Planned

Enable users to see who is on the project (make special right)

Currently, a normal user cannot see the project participants. This is exclusively accesible by the project owner role. There is a workaround that this person creates an issue and looks into the assign to dropdown. But this is not really a satisfyi...
28 days ago in ProjectWise 365 / Administration 0 Needs review

Design Review connection controls - re-order connection executions

Hi. On some imodels we need a few different connections so we can better manage the content and sync routines/timeline. It would be nice if we could order the connections and group them into a batch for scheduling. That way we could make sure that...
28 days ago in ProjectWise 365 / Design Review 0 Needs review

PWDM - General Correspondence and RFI package types should have their own security assignments in the manage roles section

Product Area: PWDM - RFI, GC package Types. Requirement: PWDM security configuration does not provide package level granular control for allocation of user access. Users who are implementing General Correspondence (GC) and RFI types would prefer t...
6 months ago in ProjectWise Design Integration 1 Needs review

Allow new version in accepted document

When we create a new version of the transmission, we have a view that allow the users to see documents base on their acceptance. Only the to update document show the new version action. For document under accepted document, we found out that we of...
14 days ago in Deliverables Management 0 Future consideration

Transmittals Autofill Title (Description)

Deliverables management to utilize data within the project in ProjectWise for the Title (Description) for Transmittals and submittals.
2 months ago in Deliverables Management 0 Needs review

Project Insights Reporting - Update Frequency

Currently Project Insights' reports are getting updated every 8 hrs. Ideally reporting should be real-time. However, to meet business requirements, we need to change interval from 8 hrs. to 2 hrs. Initially ticket was raised (CS0121548) and suppor...
12 months ago in ProjectWise Project Insights 0

Export users ability in Infrastructure Cloud

You have the ability to import users but not export to excel document or another format.
about 1 month ago in ProjectWise 365 / Administration 1 Future consideration