Currently in the ProjectWise Network Control Panel if you enable or disable a server and have "Cache Network Topology" turned on, it can take up to 10 minutes for the change to actually start working in ProjectWise Explorer. (see case CS0203452 fo...
The ProjectWise Explorer and Admin User Interfaces are outdated. It would be great if they were redesigned to look more modern and not have UI locks on every operation (the green progress bar freezes the whole interface whenever a big file is bein...
Transition Buttons behavior that have Required Conditions
in forms, each transition button can have a conditions that has to be met to use it. If a user selects the option then they get an error message that may not be intuitive. Can only transition buttons show up where the condition is met, or a button...
When we exchange transmissions, the assignee get reset to the sender. Which is fine when transmission occur between two organization. In our case we use transmission to conduct internal review. Having the assignee replace is not need, because when...
RFI module - Originator needs to add additional information
My team has been using the RFI module for a few months now and a consistent piece of feedback has been, how can the originator or the RFI add some additional data to it after it has been issued to the Responder?
A user created and managed list of datasource favorites would help navigation efficiency
Many organizations, my own included now have an extensive list of datasources in PWDI. When coupled with the extensive lists of other organizations as connections are made for work collaboration partnerships, these datasource lists can be overwhel...
Within the RFI tool it is a mandatory requirement to assign a priority setting to the RFI (High, Medium, Low). Separately there is a requirement to add a response due date. Typically in project delivery the response date for an RFI or TQ aligns wi...
Hi,
Something that's driven me crazy for years is the Export tool in ProjectWise Client.
Many times, I want to export the selected file and NOT the references...
Lots of reasons why I may want to do this and, regularly, our files have 20, 30...
Create option to select "Confidential Data Included" with RFI's and General Correspondence like you can in Transmittals.
The option to select "Confidential Data Included" in Transmittals is very helpful with confidential data and attached files. We have a need for this in RFI's and General Correspondence as well.