Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1077 of 1077

Add an indicator to folder structure that there is a file somewhere down the path; if no indicator someone would not waste time looking down empty folder paths

It is useful because invariably projects are set up with folder templates and result in a vast tree of empty folders. Everyone who browses the folder structure would benefit. It will eliminate wasted time spent browsing down empty folder paths.
almost 3 years ago in ProjectWise Design Integration 0 Needs review

Have the ability of assign a version of ORD per project

Instead of having to do an open with and guessing what version ORD to use. Having the the ability to assign what version a project uses would save a lot of time.
over 1 year ago in ProjectWise Design Integration 3 Needs review

Add User setting 'Can only login through ProjectWise Web and ProjectWise Web View'

Add User setting 'Can only login through ProjectWise Web and ProjectWise Web View' in ProjectWise Administrator to only allow connecting to ProjectWise via web browsers, similar to old User setting 'Can only login through Web View Server' that onl...
about 2 years ago in ProjectWise Design Integration 2 Future consideration

Support version creation

In project we have users that only interact with the projectWise drive. As such we would need to have them to be able to create new version of a document. Also the version number along with the workflow state should be display
about 1 year ago in ProjectWise Drive 0 Needs review

Export to Excel Option Easier to locate

The export data to excel option should be much more 'visible' on the table visual. At present a user needs to hover over the top right corner of a table to enable the 3 dots representing "More Options" and select the export option from there. It's...
7 months ago in ProjectWise Project Insights 0

New version when drag an drop

When we drag and drop a document, we have no option to create a new version. Also we need to make sure that if a new version is create and WRE is in use, we can tap in the WRE new version process. So basically we have two options to create a new v...
about 1 year ago in ProjectWise Web & View 0 Needs review

Better Due date definition

We have a need to define the due date for our deliverables to be based on working day versus calendar day. This being set by contract. Example the contract, mention 15 working day. As of today we input a multiple of 7 to take into account the week...
7 months ago in Deliverables Management 0 Future consideration

Change the default PWDM storage folder paths at the project creation stage

As an PW administrator, we’ve observed that Deliverables Management comes with default paths for storing transmittals, which unfortunately do not align with our existing folder structure. See the screenshot attached
7 months ago in Deliverables Management 0 Needs review

Allow the blocking of exporting folders within ProjectWise.

Currently, you can disable the export feature files but not for folders. Any basic user with read/file read permissions can export folder and all files in it, even if the files in the folder have export disabled. This allows anyone on the project ...
about 1 year ago in ProjectWise Design Integration 3 Needs review

Issue - Connection with iModel

As a user, I would like to add a linked item after the issue has already been created. Currently, I either raise an issue from the iModel (can have a linked item) or I raise an issue from the ISR (has no linked item). An option to either 1) link a...
about 1 year ago in Infrastructure Cloud / Design review - 3D 0 Needs review