Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 925

Automatically Synchronize a Project

When signing into PW Drive, users should be automatically synchronized to a project where they have checked out documents.
3 months ago in ProjectWise Drive 0 Needs review

Deliverable management column for document ID

is it possible to add the Document attached "DC reference number" to deliverables column?
16 days ago in Deliverables Management 0 Needs review

Remove Extra PW Drive System Folders in File Explorer

There is a defect in Drive where Extra PW Drive system folders are created and the only way to remove them is through the registry. We would prefer that future versions of PW Drive check for extra system folders when the application is being insta...
about 1 month ago in ProjectWise Drive 0 Needs review

IC workspace Delete issue button

the iTwin Owner needs to be able to delete comments (issues and tasks) within the iTwins especially if they get made incorrectly.
5 months ago in Infrastructure Cloud / Issues 0 Needs review

API Access Rights

Please add Work Area permission calls to the API Access Rights to allow web forms to function properly. PowerShell has given us so many headaches and no one can seem to help us get it figured out.
about 1 month ago in ProjectWise Design Integration 0 Needs review

Granular Security Read Access to nodes

With Granular Access enabled currently the only option is to have Full Control, Change Permissions, or Change Settings. Is there a way to add Read Access? This would be extremally helpful for allowing certain users to see User List membership whil...
12 months ago in ProjectWise Design Integration 0 Needs review

Make 'Show all versions' a folder specific option

We create document sets of our review files, so then when new versions of the documents get added, the document set looks empty unless the user selects 'Show all versions'. It would be much better for this document set to always show all version b...
4 months ago in ProjectWise Design Integration 0 Needs review

Design review workflows that are created by forms need to be linked back to PWDI server files

When working with Oklahoma DOT using 3D Design Review they have almost come to the conclusion that creating a form and setting up a workflow doesn't really matter if the workflow does not connect the the actual PW DI document. Or at least have it ...
4 months ago in Infrastructure Cloud / Design Review 2 Needs review

Daily Overdue Email Notification

Hi, Currently for deliverables email notifications, the overdue notification email is sent only once after the due date. Can we have the option to configure the frequency of email notifications in ProjectWise? The client would like to have a daily...
6 months ago in Deliverables Management 2 Needs review

Add permission to checkout in access control rules

It would be fantastic to have a permission to avoid users checking out the document when it has passed the Draft/WIP status, while allowing them to open/download the document. This would reduce administrative burdens for Document Managers taking c...
4 months ago in ProjectWise Design Integration 2 Needs review