Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1125

Add back adding a Flatset to an email recipient as link

We used to be able to highlight a Flatset, Right Click on the Flatset and send to mail recipient as link. This was such a helpful item that was taken away in PW.
about 1 month ago in ProjectWise Design Integration 0 Needs review

Manual creation of relationships in Dependency Viewer

When CAD files are referenced, ProjectWise keeps track of the references automatically in the Dependency viewer. It would be fantastic to create dependencies between documents of any kind manually. This way, document controllers and users would ha...
6 months ago in ProjectWise Design Integration 0 Needs review

Option to store a Clip Volume with Clash

Our 3D models are very large, so we always create a clip volume with a range around the area. Otherwise the clarity is very limited. It would therefore be very desirable and advantageous if you could save the clip volume together with the clash po...
11 months ago in Infrastructure Cloud / Design review - 3D 0 Needs review

Allow to move documents without delete permissions

Our users are requesting to be able to move documents without having the "Delete" permission. A new "move" permission would need to be included in Access Control rules.
6 months ago in ProjectWise Design Integration 0 Needs review

"OR" function configuration in DDM / Distribution of Transmittal

Below is the detail scenario: Example: No of Document: 01 Document Number: Doc-001 Transmittal Number: TRN-001 Stakeholders: TRN creator: Person: A TRN Receivers / Reviewers: Person B & Person C (Withing same team, Let's say Civil Team) Enhanc...
about 1 year ago in Deliverables Management 1 Future consideration

Review Sessions

Enable the ability to have review periods or sessions, and to establish notifications at a session level, rather than a comment level. Example: The review organizer sets a schedule for the QC review. Those in the reviewer role, will have a 5 day w...
22 days ago in Infrastructure Cloud / Issues 0 Needs review

Notification settings - Global and Project

Enable the project owner to set notification configurations for users unilaterally, across a project, or even organization, rather than requiring each user to configure their notifications. Overabundance of notifications drives people away from th...
22 days ago in Infrastructure Cloud / Issues 0 Needs review

Issues Summary Email

Enable the ability for users to receive a summary of all issues they are a participant in, once per day, instead of notification for every comment that changes. One email that lists the projects they are a part of and the status of comments that p...
22 days ago in Infrastructure Cloud / Issues 0 Needs review

Removing assigned Consolidator, then assigning a new one

The user removed the assigned Additional Reviewers and Consolidator since she wants to replace the assigned Consolidator but upon adding again Additional Reviewers and tagging one user as Consolidator, the user encounters an error and the process ...
23 days ago in Deliverables Management 0 Needs review

Default Frontstage option for Infrastructure Cloud

Ability to set or remember the default/starting Frontstage for user. Instead of just going to Main View when I use Civil most of the time.
3 months ago in Infrastructure Cloud / Design review - 3D 0 Future consideration