Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Infrastructure Cloud

Showing 266

Math function for Number Control calculate days between two dates

Currently, math functions are specific to type of control. Meaning a Number control math function is limited to other Number controls. We would like to be able to use other type of controls such as Date Pickers, so we can calculate the number of d...
about 1 year ago in Infrastructure Cloud / Issues 0 Planned

iTwin - swap the sequence of file description and file name

In the list of iModel names within the list tree, the model descriptions are shown before the file number. In ProjectWise, files are listed as File Name, and then File Description. This makes it easier to determine the owner/discipline/sequence of...
3 months ago in Infrastructure Cloud / Design Review 0 Future consideration

iTwin - Undocked list cannot be placed on another screen

Where the list of models, categories etc can be undocked, it can't be moved to another screen. It would greatly help navigation for the user, especially since most users work across two screens too. It allows better viewing of the design model and...
3 months ago in Infrastructure Cloud / Design Task 0 Needs review

Allow external team members in Infrastructure Cloud projects

In the Connection Client projects, there was an option to "Allow external team members" to an organization. This allowed to automatically entitle external users to an organization to participate in projects. However, in Infrastructure Cloud this o...
about 1 year ago in Infrastructure Cloud / Administration 3 Future consideration

Sort Projects by Project Number on the 'My Projects' page

Our project numbers are incremental where as our project names are location / scope based. Having the option to sort by project number allows the user to see the most recent projects easily. Currently, changing the sorting option by Alphabetically...
over 1 year ago in Infrastructure Cloud / Administration 0 Needs review

Format of Forms

It can be difficult to digitize documents that are in landscape format. The width of Forms is limited and extending the default width may slow down your setup. It is a necessity to be able to extend the possible width of the form to landscape format.
3 months ago in Infrastructure Cloud / Work Inbox 0 Needs review

Geolocalisation

We are being provide many files with no geolocalisation or wrong one. And we would like to make changes to the Imodel to place element to the correct geolocation. Request is to allow the option to change the localisation once the file have been sy...
over 1 year ago in Infrastructure Cloud / Design review - 3D 1 Needs review

Save comparaison

Once we create a comparaison, we should be able to save it, so we can comeback without having to compare again. The same we can save a view, we should be able to save the comparaison results
over 1 year ago in Infrastructure Cloud / Design review - 3D 2 Needs review

Add geolocalization and set extends of a model in BIC like in PW365

As a user, I believe the PW365 functionality to set the extends of a model manually is missing in BIC (functionality is described here: https://communities.bentley.com/products/digital-twin-cloud-services/itwin-services/w/synchronization-wiki/6807...
11 months ago in Infrastructure Cloud / Design review - 3D 1 Needs review

PDF Markup Date Format

Issues in PDF Markup will not show the date format consistent with the browser, only the American format, which is suboptimal outside the US. The requirement is for the PDF Markup interfaces and Issues within it to reflect the date format enforced...
about 1 year ago in Infrastructure Cloud / Design Review 0 Needs review