All System Attributes Should Be Included

There are tons of custom environment attributes you can map to the attributes in Insights, but when building reports in tabs you can't sort/filter/display on system generated file attributes like file type (DGN, DOC, XLX), file creation date, and ...
almost 3 years ago in ProjectWise Project Insights 1

Update document codes in PW 365 interface

We would like the ability to change the document code from the PW 365 interface as we are beginning to utilize document codes.
12 months ago in ProjectWise Web & View 0 Needs review

Model tree ability to visualise the models contents when selected in the model tree.

It would be very useful if we could click on a model in the model tree and have it highlight the geometry onscreen so we can see what is contained in that model before turning it off.
12 months ago in ProjectWise 365 / 3D Design Reviews 0 Needs review

Environments should be able to dictate Interface in addition to View

A specific folder data Environment can dictate a user's View, but not their Interface. Since ProjectWise Attribution is controlled by Environment and linked to Interface, these should all be cohesively tied together. Right now, there are instances...
over 1 year ago in ProjectWise Design Integration 0 Needs review

Modify multiple documents

When we select multiple document, and select Modify. All the attributes of an environment are display. Request is to allow us to filter those attributes to display only those relate to a Interface or the attributes display by the visible columns
over 1 year ago in ProjectWise Design Integration 0 Needs review

Math function for Number Control calculate days between two dates

Currently, math functions are specific to type of control. Meaning a Number control math function is limited to other Number controls. We would like to be able to use other type of controls such as Date Pickers, so we can calculate the number of d...
10 months ago in ProjectWise 365 / Issues 0 Planned

Select multiple projects in PBI Project insights

For proper comparison and analytics, we'd like to compare projects by being able to select more than 1 project_id at a time in Project Insights and in the PowerBI file listed here: https://communities.bentley.com/products/projectwise/m/mediagaller...
10 months ago in ProjectWise Project Insights 1

Show audit trail comments/actions

I would like to be able to create reports based on audit trail - first and foremost is the comment function that would help me a lot.
almost 3 years ago in ProjectWise Project Insights 0

Would it be possible to dedicate an Interfaces to a given User List?

I think it would be interesting if we could make dedicated Interfaces by User List whose data would not be visible to others. For example: Have a generic interface(accessible to everyone) and an interface for contract data (accessible to Contract ...
almost 2 years ago in ProjectWise Design Integration 1 Needs review

Always synchronize files in Drive folder with ProjectWise

When we add a file in DRIVE, it is added in PW by default if we are in an environment with no document code but not if there is a document code. Could we have an option to add it in PW in any case? It could be added with no wizard by default if it...
over 1 year ago in ProjectWise Drive 0 Needs review