Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1183

project List

For major project that require adding multiple external partner ( sometimes 20 to 50 are tier 1 or tier 2), we would like to have all external site to be listed under the main project with a little offset to make it easier to visualize. ( Like bul...
3 months ago in Infrastructure Cloud / Home Page 2 Needs review

Include form link in the Exported Excel

In the Excel file that is exported with all the data from a form, I would like the link to access the form to be included.
6 months ago in Infrastructure Cloud / Issues 0 Needs review

Make "Importing Package Files" a background task

Currently when acknowledging Submittals in PW Explorer that have large documents in them, it takes a long time for the documents to download and import. This morning I had 14 transmittals to acknowledge, many having large models greater than 1GB f...
12 months ago in Deliverables Management 0 Future consideration

Document Review > PDF Markup > Custom stamp > option to load a image for a stamp

Document Review > PDF Markup > Custom stamp > option to load a image for a stamp Now Custom stamp only allows minimal changes. User s would like the option to load also a image to be used as a custom stamp
about 1 year ago in Infrastructure Cloud / Design Review 0 Needs review

Have ProjectWise DI, WSG and other related services support oauth2

When having automations / services running towards the ProjectWise product line there is a need for a secure method of authentication where user interaction is not needed on regular basis (monthly) Not having this is causing many issues for us. Al...
9 months ago in ProjectWise Design Integration 0 Planned

Math function for Number Control calculate days between two dates

Currently, math functions are specific to type of control. Meaning a Number control math function is limited to other Number controls. We would like to be able to use other type of controls such as Date Pickers, so we can calculate the number of d...
about 1 year ago in Infrastructure Cloud / Issues 0 Planned

Suggestion: Adding an Additional Field for Reference Transmittal Linked to Parent

Proposal: Introducing Enhanced Transmittal Connection and Reference Feature We have identified situations where it becomes necessary to establish connections between two or more transmittals without utilizing the resend new version or forwarding t...
over 1 year ago in Deliverables Management 2 Future consideration

Administrators Role

Need to add an Administrators role for projects in Infrastructure Cloud, similar to the Admin role that we have in Synchro Control.
over 1 year ago in Infrastructure Cloud / Administration 0 Planned

Disable Free option in M365 co-authoring to session initiator only.

Co-authoring on M365 documents is a game changer, but not when an unknowing participant "frees" a document -all changes from all co-authoring participants are lost. At present, the free option is controlled at a user level in DI - so turning it of...
over 1 year ago in ProjectWise Web & View 0 Needs review

Link from Issue to 3D Design Review

It would be a helpful feature if the Issues which createtd in in the 3D Design review had a link in the "My Work Inbox" or "My Issues" section to jump directly in the 3D Model with focus to the Issue.
almost 3 years ago in Infrastructure Cloud / Design review - 3D / Issues 0 Needs review