Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1063

To be able to copy and paste documents / folders directly in the projectwise web interface

It is only possible to move a file, but it is very necessary to be able to copy documents / folders inside the web interface, aim is fi. to duplicate attributes during the copy.
over 1 year ago in ProjectWise Web & View 2 Needs review

Add a project Gantt Chart

Since this is relate to project management. I feel this should be link to Project Insight. When we start a project we have a gantt chart that allow us to track project startup activities. Request is to have a gantt chart capabilities. Exemple we c...
about 1 year ago in ProjectWise Project Insights 0

Need to have the thumbnails visible in the Bentley Plug-in similar to Web browser.

Can we have the web browser and the Bentley Plugin "Content" interface same
about 2 years ago in ProjectWise Components Center / Design System Integration 0 Planned

Can we have a preview(Enlarged image) of component when we hover over on image of the component into catalogues.

No description provided
about 2 years ago in ProjectWise Components Center / Component Management 0 Needs review

Import/Export Excel Able to Use ProjectWise Locations for Excel File Location

Add the ability for the location of the Excel files used in the Import/Export Excel tool to be able to choose locations within ProjectWise. Currently you can only choose locations from your local computer or server. This is a problem when consulta...
9 months ago in ProjectWise Design Integration 0 Needs review

Limit use of the Scan References and Link Sets.

We have had many issues where users run a Scan References and Link Sets against a folder or many files and they do not know what they are doing. Many hours have been spent fixing the references.
9 months ago in ProjectWise Design Integration 0 Needs review

environment folder

As we wanted to have multiple project under the same datasource, we need to copy environment to make small tweak. Example document code may change from project to project. As such, if we copy a set of environment we end up with a big list of envir...
about 1 year ago in ProjectWise Design Integration 0 Needs review

Recalling a responded/closed transmittal must require confirmation first from the recipient before it proceed

It is understandable that there may be cases wherein responded/closed Transmittal might still need to be recalled, but said recall must be agreed first by both the sender and the recipient. This can be done by adding the process wherein the recipi...
over 1 year ago in Deliverables Management 3 Future consideration

Document Code and Revision code enhancement

Request Have the document code independent of the environment Have enhancement for the Revision code so it can be configure the same way as the document code. The Document code and the revision code should be independent but could be link to an en...
about 1 year ago in ProjectWise Design Integration 0 Needs review

Test Absolute Path Feature

Test ProjectWise Drive absolute path feature & functionality. As this is a global setting we cannot test this without making changes to all production datasources.
about 1 year ago in ProjectWise Drive 0 Needs review