ProjectWise Project Insights

Showing 26

Export to Excel Option Easier to locate

The export data to excel option should be much more 'visible' on the table visual. At present a user needs to hover over the top right corner of a table to enable the 3 dots representing "More Options" and select the export option from there. It's...

Selecting folders within InSights

When selecting which folders to report on in Insights, it would be good if there was an option to select a master folder and all sub folders within, rather than having to select folder by folder. Currently if we want to report on one or 2 folders ...
2 days ago in ProjectWise Project Insights 0

Projectwise Document Web URL link

It would be great if there was an option within InSights that gave the ability to provide a hyperlink to a document in the Web Library. This would be a handy feature where a user may be performing a Insights report on Deliverables issued in the as...
2 days ago in ProjectWise Project Insights 0

RFI is not populating in ProjectWise Insights (Dashboard)

We are not able to capture RFIs inside ProjectWise Insights. Not sure why, We understand that it's only capturing ProjectWise Transmittals and Submittals
5 months ago in ProjectWise Project Insights 0

Ability to have a ProjectWise Web link in the report visuals to each PWDI document.

We would like to be able to incorporate in our Project Insights visuals a document ProjectWise Web link (URL/UDN) to the ProjectWise Design Integration work area that is associated to the Project Insights service. This would allow the project Engi...
6 months ago in ProjectWise Project Insights 0

Project Insights Reporting - Update Frequency

Currently Project Insights' reports are getting updated every 8 hrs. Ideally reporting should be real-time. However, to meet business requirements, we need to change interval from 8 hrs. to 2 hrs. Initially ticket was raised (CS0121548) and suppor...
5 months ago in ProjectWise Project Insights 0

Select multiple projects in PBI Project insights

For proper comparison and analytics, we'd like to compare projects by being able to select more than 1 project_id at a time in Project Insights and in the PowerBI file listed here: https://communities.bentley.com/products/projectwise/m/mediagaller...
5 months ago in ProjectWise Project Insights 0

PWDM Custom Status

If custom response status being used in Deliverable Management's transmittal, Project Insight will not display any data relating to that, other than displaying generic status. It will be good if specific custom response status can be trackable thr...
about 1 month ago in ProjectWise Project Insights 0

Good

No description provided
about 2 months ago in ProjectWise Project Insights 0

All System Attributes Should Be Included

There are tons of custom environment attributes you can map to the attributes in Insights, but when building reports in tabs you can't sort/filter/display on system generated file attributes like file type (DGN, DOC, XLX), file creation date, and ...
over 2 years ago in ProjectWise Project Insights 1