Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1117

ProjectWise Client Export without references

Hi, Something that's driven me crazy for years is the Export tool in ProjectWise Client. Many times, I want to export the selected file and NOT the references... Lots of reasons why I may want to do this and, regularly, our files have 20, 30...
almost 2 years ago in ProjectWise Design Integration 2 Future consideration

Personal views do not display in Project when views assigned locally in resources

If Project is configured to use project-specific views(Locally assigned). Personal views do not display. To use/view Personal Views, we have to inherit Views from the datasource level. This change will display all other views available in datasour...
11 months ago in ProjectWise Design Integration 1 Needs review

Clear topology cache on control panel save

Currently in the ProjectWise Network Control Panel if you enable or disable a server and have "Cache Network Topology" turned on, it can take up to 10 minutes for the change to actually start working in ProjectWise Explorer. (see case CS0203452 fo...
8 months ago in ProjectWise Design Integration 0 Future consideration

Fixed working directory for ProjectWise Web

For Explorer, we have a local directory for checked-out files. However, in the web version, there is a dependency to synchronize the project to Drive. When you check out a file without synchronizing the project, it is considered a download. When w...
9 months ago in ProjectWise Web & View 0 Needs review

Summarized mail notification to avoid mail spam

It would be nice to receive a summarizing mail with all issues, just like Microsoft Teams do with missed activities. This to avoid a spam of mails, when people are doing the design review. Therefore it could be nice to have the option to chose the...
about 1 year ago in Infrastructure Cloud / Issues 1 Needs review

Ability to have a ProjectWise Web link in the report visuals to each PWDI document.

We would like to be able to incorporate in our Project Insights visuals a document ProjectWise Web link (URL/UDN) to the ProjectWise Design Integration work area that is associated to the Project Insights service. This would allow the project Engi...
about 1 year ago in ProjectWise Project Insights 0

RFI module - Originator needs to add additional information

My team has been using the RFI module for a few months now and a consistent piece of feedback has been, how can the originator or the RFI add some additional data to it after it has been issued to the Responder?
about 1 year ago in Deliverables Management 0 Future consideration

Open multiple documents

Add the ability to select multiple documents so you can open them without having to open them one by one. to avoid opening too many documents, add a variable in dmskrnl.cfg to set the maximum number of documents to be opened, e.g. 10 documents by ...
7 months ago in ProjectWise Design Integration 0 Needs review

PW Drive configuration

To get the shortest path as possible we would like to use the Projet Number. However this does not give enough details. As such the display on the PW drive on the user PC should be Project number- the name Example a corporate setup will give this:...
3 months ago in ProjectWise Drive 0 Needs review

Align Priority with Scheduling in RFI tool

Within the RFI tool it is a mandatory requirement to assign a priority setting to the RFI (High, Medium, Low). Separately there is a requirement to add a response due date. Typically in project delivery the response date for an RFI or TQ aligns wi...
over 1 year ago in Deliverables Management 2 Future consideration