Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1125

Import Design Tasks

Need to be able to import a schedule of design tasks from excel or another outside source. Currently entry method for many tasks is very cumbersome.
over 3 years ago in Infrastructure Cloud / Design Task 0 Needs review

Create links to unique document code

I would like to be able to construct links directly to a document code. Currently the only options are to copy a URL or URN for a document. Background: Document Codes are used to generate names in a consistent manner and ensure that there is one c...
over 2 years ago in ProjectWise Design Integration 1 Needs review

Auto depot of document

Request is have a way to schedule transmission to request document ( single or multiple) to be deposited in a PW specific folder with the proper attributs filled.
over 1 year ago in Deliverables Management 0 Future consideration

Set Working day instead of calendar day

Request is to add the possibility to set response date based on working day as oppose to calendar days. and taking into account the holidays for each regions.
over 1 year ago in Deliverables Management 2 Will not implement

Assign multiple additional reviewers

When we receive a transmittal and we need to ask multiple additional reviewer, the additional reviewers seem assign per document not per the whole transmission. Forward on the other hand seem to allow sending the whole transmittal to external to c...
over 1 year ago in Deliverables Management 3 Already exists

Add Japanese, Korean and Chinese Language Packs for PW Ver. 3.453

Rolling out new sites acquired from Dupont in those 3 countries currently.
over 1 year ago in ProjectWise Design Integration 0 Needs review

Allow Attachement to Design Task

Project Administration Design task is being used to keep track of project task. Example timesheet correction. Request is to allow us to attach a file OR link a file from the Document Vault If a file is attach, the process will ask to save the file...
over 2 years ago in Infrastructure Cloud / Administration 0 Needs review

Relative path stored in ProjectWise Revit Advanced Integration project

It would be easier to be able to store relative path to a project to create a RAI project template.
about 5 years ago in ProjectWise Design Integration 0 Needs review

PW environement attribute mapping to Revit Global parameters in Advanced Revit Integration

It would upload PW attributes of the Revit document in Revit, and these Revit parameters can be used to be common to all sheets in Project Parameters, already used to map Attributes sheet attributes to published DWG and PDFs. We would need also an...
about 5 years ago in ProjectWise Design Integration 0 Needs review

PDF Document Review - You cannot see all Issue details and comments in one place especially if many comments or conversation has occurred

PDF Document Review - You cannot see the substantive comments of others as reading through the document – to do this requires each issue to be individually opened and closed. This does not allow for a holistic review of the document with all subje...
over 2 years ago in Infrastructure Cloud / Design Review / Issues 0 Needs review