Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1077

Open multiple documents

Add the ability to select multiple documents so you can open them without having to open them one by one. to avoid opening too many documents, add a variable in dmskrnl.cfg to set the maximum number of documents to be opened, e.g. 10 documents by ...
6 months ago in ProjectWise Design Integration 0 Needs review

Renditions to be able to use the model desc. as the page (bookmark) name

when using renditions to make sets from dgn files. i need the ability to name the sheets in a multi-page pdf (bookmark for each sheet) to use the sheet model desc. property as that page name.
3 months ago in ProjectWise Design Integration 0 Needs review

Fixed working directory for ProjectWise Web

For Explorer, we have a local directory for checked-out files. However, in the web version, there is a dependency to synchronize the project to Drive. When you check out a file without synchronizing the project, it is considered a download. When w...
8 months ago in ProjectWise Web & View 0 Needs review

Personal views do not display in Project when views assigned locally in resources

If Project is configured to use project-specific views(Locally assigned). Personal views do not display. To use/view Personal Views, we have to inherit Views from the datasource level. This change will display all other views available in datasour...
10 months ago in ProjectWise Design Integration 1 Needs review

ProjectWise Client Export without references

Hi, Something that's driven me crazy for years is the Export tool in ProjectWise Client. Many times, I want to export the selected file and NOT the references... Lots of reasons why I may want to do this and, regularly, our files have 20, 30...
over 1 year ago in ProjectWise Design Integration 2 Future consideration

RFI module - Originator needs to add additional information

My team has been using the RFI module for a few months now and a consistent piece of feedback has been, how can the originator or the RFI add some additional data to it after it has been issued to the Responder?
12 months ago in Deliverables Management 0 Future consideration

Ability to have a ProjectWise Web link in the report visuals to each PWDI document.

We would like to be able to incorporate in our Project Insights visuals a document ProjectWise Web link (URL/UDN) to the ProjectWise Design Integration work area that is associated to the Project Insights service. This would allow the project Engi...
about 1 year ago in ProjectWise Project Insights 0

Bring back iDesktop Auto-Login to ProjectWise 2023

Users are complaining that they have to click login each time. Yes it remembers their name, but everyone is used to it auto logging in to PW.
10 months ago in ProjectWise Design Integration 1 Needs review

BIC - iModel copy measurement result values

If you create a measurement you receive the values in a properties menu. But you are not able to copy the values as it is possible for object properties. It would be helpful to have this copy option (rightklick) also for values of measurements.
10 months ago in Infrastructure Cloud / Design review - 3D 0 Needs review

Align Priority with Scheduling in RFI tool

Within the RFI tool it is a mandatory requirement to assign a priority setting to the RFI (High, Medium, Low). Separately there is a requirement to add a response due date. Typically in project delivery the response date for an RFI or TQ aligns wi...
over 1 year ago in Deliverables Management 2 Future consideration