Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 121

Change folder symbols/colors

The user experience would be better if it would be able to change colors or symbols of the different folders. For example you could assign a specific discipline a specific color.
almost 3 years ago in ProjectWise Design Integration 1 Future consideration

Clear topology cache on control panel save

Currently in the ProjectWise Network Control Panel if you enable or disable a server and have "Cache Network Topology" turned on, it can take up to 10 minutes for the change to actually start working in ProjectWise Explorer. (see case CS0203452 fo...
7 months ago in ProjectWise Design Integration 0 Future consideration

ProjectWise Client Export without references

Hi, Something that's driven me crazy for years is the Export tool in ProjectWise Client. Many times, I want to export the selected file and NOT the references... Lots of reasons why I may want to do this and, regularly, our files have 20, 30...
almost 2 years ago in ProjectWise Design Integration 2 Future consideration

RFI module - Originator needs to add additional information

My team has been using the RFI module for a few months now and a consistent piece of feedback has been, how can the originator or the RFI add some additional data to it after it has been issued to the Responder?
about 1 year ago in Deliverables Management 0 Future consideration

Align Priority with Scheduling in RFI tool

Within the RFI tool it is a mandatory requirement to assign a priority setting to the RFI (High, Medium, Low). Separately there is a requirement to add a response due date. Typically in project delivery the response date for an RFI or TQ aligns wi...
over 1 year ago in Deliverables Management 2 Future consideration

Allow new version in accepted document

When we create a new version of the transmission, we have a view that allow the users to see documents base on their acceptance. Only the to update document show the new version action. For document under accepted document, we found out that we of...
about 1 month ago in Deliverables Management 0 Future consideration

Transition Buttons behavior that have Required Conditions

in forms, each transition button can have a conditions that has to be met to use it. If a user selects the option then they get an error message that may not be intuitive. Can only transition buttons show up where the condition is met, or a button...
10 months ago in Infrastructure Cloud / Issues 0 Future consideration

Implement user-defined fields like in PWE Attributes and More Attributes tabs.

Implement user-defined data fields in Deliverables Management, like the “Attributes” and “More Attributes” tabs in ProjectWise Explorer. The intent is to have Deliverables Management export a spreadsheet containing vital data fields needed in a De...
4 months ago in Deliverables Management 0 Future consideration

RFI - Send response button - Add confirmation button

When sending a response to an RFI the end user would benefit from an additional pop up window confirming that they wish to send the response.
about 1 year ago in Deliverables Management 0 Future consideration

Add a distribution matrix to a package type other than a transmittal

We have created new package types that a distribution matrix would be beneficial
6 months ago in Deliverables Management 0 Future consideration