Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1068

Export to Excel Option Easier to locate

The export data to excel option should be much more 'visible' on the table visual. At present a user needs to hover over the top right corner of a table to enable the 3 dots representing "More Options" and select the export option from there. It's...
7 months ago in ProjectWise Project Insights 0

iModel name in headline

If you are open an iModel there is no name written of it in the headline. If you have similar iModels (as I do) sometimes you get confused which one is opened. It would be a benefit if the headline would show the opened iModel name. For exmple: Pr...
over 1 year ago in ProjectWise 365 / 3D Design Reviews 0 Needs review

Enhancement Requests for PWDM

VDOT is utilizing PWDM all the time. We will soon have 1000+ projects in place. With all these users we get questions and suggestions on what we'd like enhanced Please see below: 1. When user selects a Distribution Rule, it automatically fills in ...
about 1 year ago in Deliverables Management 1 Will not implement

Add ability to create custom Workflow Templates

We often find ourselves using the same base custom Workflow Template for most forms/issues. Bentley provides 3 template options but there is no way to add to this library. This has led us to a lot of manual work to duplicate workflows across all o...
3 months ago in ProjectWise 365 / Issues 0 Needs review

Better Due date definition

We have a need to define the due date for our deliverables to be based on working day versus calendar day. This being set by contract. Example the contract, mention 15 working day. As of today we input a multiple of 7 to take into account the week...
7 months ago in Deliverables Management 0 Future consideration

Change the default PWDM storage folder paths at the project creation stage

As an PW administrator, we’ve observed that Deliverables Management comes with default paths for storing transmittals, which unfortunately do not align with our existing folder structure. See the screenshot attached
7 months ago in Deliverables Management 0 Needs review

Control of Datasource Visibility

Hi, It would be great to be able to control the visibility of Datasources so the available options can be reduced. My datasource list is massive as each organisation has multiple spaces and are adding more every day. Apart from my own organisation...
over 3 years ago in ProjectWise Design Integration 5 Already exists

Have the ability of assign a version of ORD per project

Instead of having to do an open with and guessing what version ORD to use. Having the the ability to assign what version a project uses would save a lot of time.
over 1 year ago in ProjectWise Design Integration 3 Needs review

Add an indicator to folder structure that there is a file somewhere down the path; if no indicator someone would not waste time looking down empty folder paths

It is useful because invariably projects are set up with folder templates and result in a vast tree of empty folders. Everyone who browses the folder structure would benefit. It will eliminate wasted time spent browsing down empty folder paths.
almost 3 years ago in ProjectWise Design Integration 0 Needs review

Support version creation

In project we have users that only interact with the projectWise drive. As such we would need to have them to be able to create new version of a document. Also the version number along with the workflow state should be display
about 1 year ago in ProjectWise Drive 0 Needs review