Hello, we have many projects that work as joint venture where multiple organisations work together to complete the project. Currently the co authoring feature does not work across multiple organisations but would be good so users across the projec...
Propagate the logic of using the ISO19650 to Forms, deliverable and other. This way we can keep naming coding consistent throughout the PW various interfaces.
is it possible to see the approval status of the documents like A, B, C, or D status, instead of seeing only "Acknowledged" and "Responded" on the landing page of the syatem.
A certain drawing cannot be searched as it is issued through drawing submittal sheet.
Unable to search using document reference number unless it is mentioned on the subject of the submission.
Select Documents from different folders when we create a Document Set
When creating a document set, we currently have the option to select documents from a single folder. After creation, we then need to search for documents located in different folders and add them individually.
Our suggestion is that in the init...
Add existing SDK "Backup local copy if Use Up to date Local Copy setting is not used" setting to PWDI GUI
This setting is currently available in the SDK and is a very valuable option for users to not lose ant locally edited document copies when they refreshed. Adding a command to the GUI for this already-existing functionality would be great for users...
Add existing SDK "Refresh local copy on Free" setting to PWDI GUI
This setting is currently available in the SDK and is a very valuable option for users to control how/when documents are refreshed when freed. Adding a command to the GUI for this already-existing functionality would be great for users wanting to ...
Create New Version on CheckIn (or even during the design session).
Current workflow requires that a Version be created prior to opening the file. I often find that it is not until while I am editing a file, that I determine that a new version is warranted. This requires closing the file, creating new version then...
Avoid going through different portals when you open a shared link.
When we share the link to a document, upon opening the link, the web page redirects to ProjectWise 365 and then takes a few seconds to finally open in Infrastructure Cloud. This should be avoided, as it takes a long time and is confusing to jump b...