All ideas

Showing 837 of 837

Export to Excel Option Easier to locate

The export data to excel option should be much more 'visible' on the table visual. At present a user needs to hover over the top right corner of a table to enable the 3 dots representing "More Options" and select the export option from there. It's...
6 days ago in ProjectWise Project Insights 0

Selecting folders within InSights

When selecting which folders to report on in Insights, it would be good if there was an option to select a master folder and all sub folders within, rather than having to select folder by folder. Currently if we want to report on one or 2 folders ...
6 days ago in ProjectWise Project Insights 0

Projectwise Document Web URL link

It would be great if there was an option within InSights that gave the ability to provide a hyperlink to a document in the Web Library. This would be a handy feature where a user may be performing a Insights report on Deliverables issued in the as...
6 days ago in ProjectWise Project Insights 0

Better Due date definition

We have a need to define the due date for our deliverables to be based on working day versus calendar day. This being set by contract. Example the contract, mention 15 working day. As of today we input a multiple of 7 to take into account the week...
7 days ago in Deliverables Management 0 Future consideration

Change the default PWDM storage folder paths at the project creation stage

As an PW administrator, we’ve observed that Deliverables Management comes with default paths for storing transmittals, which unfortunately do not align with our existing folder structure. See the screenshot attached
8 days ago in Deliverables Management 0 Needs review

Standardize the ProjectWise Handshake

Can the ProjectWise handshake be standardized? As discussed in Case CS0088762, ProjectWise has a handshake that is “wrapped into proprietary protocol (additional ACKs for confirming reception).” We currently use a Cisco firewall with SNORT 2.0. Wh...
8 days ago in ProjectWise Design Integration 0 Needs review

Clear topology cache on control panel save

Currently in the ProjectWise Network Control Panel if you enable or disable a server and have "Cache Network Topology" turned on, it can take up to 10 minutes for the change to actually start working in ProjectWise Explorer. (see case CS0203452 fo...
8 days ago in ProjectWise Design Integration 0 Future consideration

Parallel downloads

While downloading workspace files, or files with many references, PW downloads files sequentially. This results in long load times, even when there is plenty of unused network bandwidth. Why doesn't ProjectWise download multiple files in parallel ...
8 days ago in ProjectWise Design Integration 0 Needs review

Move document without the need of delete permission

When we want to authorize a group of user to move document from one folder to another, we need to enable Delete. What we found out is that if we enable delete, this also enable Read and Write to the folder. Request is to allow the permission Move,...
9 days ago in ProjectWise Design Integration 0 Needs review

Daily report on any updates/deletes and addition of new documents across the storage areas

We would like to have a report that has instanceID (GUID) of an object and a change-log details such as updates/deletes or new object. We would like to track the changes at the meta data level and extract the document to analyze. Currently we know...