Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1071

Time out control for ProjectWise Drive Client

As we expand our usage of the ProjectWise Drive Client with our users, it is sometimes frustrating how oftin the user must re-authenticate the client to assure proper functionality and synchronization. I would like to see a way to control this cli...
almost 2 years ago in ProjectWise Drive 0 Needs review

Create a formula in the MultiAssign binding to add all the users who are in assigned to

Once someone is assigned in a form as ‘Assigned to,’ I would like that information to remain visible throughout the entire workflow. This way, all involved parties can be aware of what has happened with the form.
3 months ago in ProjectWise 365 / Work Inbox 0 Needs review

Issue report

When we respond to a submittal, in the same way we have a response report, we would need an issue report. This report will list all the issue that have been raised and the responder will be able to make a quick check, prior to send his transmittal.
about 2 months ago in Deliverables Management 0 Needs review

Item Type Import ProjectWise Integration

Currently, when working in ProjectWise (PW), Importing Item Types doesn't open PW dialog for selection of an Excel file to import and instead normal non-ProjectWise dialog opens. This functionality needs extended to PW dialog. It is reasonable to ...
9 months ago in ProjectWise Design Integration 0 Needs review

ProjectWise Messaging Service HTML Format

The ProjectWise Messaging service should allow for HTML emails, so ProjectWise links can be generated within the email body. Currently the plain text emails have very limited usage.
12 months ago in ProjectWise Design Integration 0 Needs review

ProjectWise Deliverables Management – Additional Reviewers Shown As Recipients

PW = ProjectWise DM = Deliverables Management We use PW DM for document review, markup, actions and action tracking. With the PW DM distribution matrix, our process is that we add Additional Reviewers (AR), extra to the Reviewer (R). See attached ...
almost 2 years ago in Deliverables Management 1 Future consideration

Daily report on any updates/deletes and addition of new documents across the storage areas

We would like to have a report that has instanceID (GUID) of an object and a change-log details such as updates/deletes or new object. We would like to track the changes at the meta data level and extract the document to analyze. Currently we know...
7 months ago in ProjectWise Design Integration 0 Needs review

Generate reports for datasource access.

Please give us the possibility to generate a report that shows who is connecting to a datasource and licenses used. Right now, we can only generate a report with the total number, we would like to have this information separated and classified for...
5 months ago in ProjectWise Design Integration 0 Future consideration

Preview CAD files on PW Web

It would be good to be able to preview CAD files within PW web. This would save users time.
over 1 year ago in ProjectWise Web & View 0 Needs review

Prevent managed workspace from pulling previous workspace file versions

When working with a managed workspace, if you have versions of files in the workspace, the wizard will copy out all versions of a workspace file, this bloats workspace sizes and copy out times which forces you to not version workspace files in PW,...
7 months ago in ProjectWise Design Integration 0 Needs review