Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1008

Recalling a responded/closed transmittal must require confirmation first from the recipient before it proceed

It is understandable that there may be cases wherein responded/closed Transmittal might still need to be recalled, but said recall must be agreed first by both the sender and the recipient. This can be done by adding the process wherein the recipi...
over 1 year ago in Deliverables Management 3 Future consideration

PWDM Interface under the web client

Request is to allow a web interface that would resume the PWDM activity in the same way we have under the PWDI
5 months ago in Deliverables Management 2 Future consideration

Connectors overview

As an owner of multiple connections across many projects, we would like to have an overview of all the connections that I am owner of
5 months ago in ProjectWise 365 / Administration 0 Needs review

Audit Trial

Infrastructure Cloud -Audit trail should display more information (e.g. Change of attributes, which attribute?). The audit trail of a form in the Design Review does not display the same depth of information compared to the audit trail in the Work ...
5 months ago in ProjectWise 365 / Design Review 0 Needs review

Filtering issues

Infrastructure Cloud - Default filtering on comments by 'open' or 'closed' as a wish; maybe set a filter on the project level can solve it.
5 months ago in ProjectWise 365 / Issues 0 Needs review

Workflow improvement

Infrastructure Cloud - A task needs to be first created in draft before it can be assigned and forwarded - Workflow improvement required because to many steps required - maybe turns into enhancement request
5 months ago in ProjectWise 365 / Issues 0 Needs review

Pre set template (seed) file in ADCW based on the Managed WorkSpace variable

Currently MS_DESIGNSEED workspace variable can set seed file as template when using no wizard, however that variable does not set template if you use a Wizard. Organization have different seed files that they could apply based on the project or ev...
about 3 years ago in ProjectWise Design Integration 1 Needs review

PWDM use for internal review

When we exchange transmissions, the assignee get reset to the sender. Which is fine when transmission occur between two organization. In our case we use transmission to conduct internal review. Having the assignee replace is not need, because when...
5 months ago in Deliverables Management 0 Future consideration

Configuration for dropdown list multiple choice

Request is to enhance the attribute configure for dropdown list with multiple choices, see attach. Reference Team task by planner
11 months ago in ProjectWise Design Integration 0 Needs review

Improve creating a plot set in ProjectWise

When you create a plot set in ProjectWise and forget to include the .ips at the end of the file name you get a popup saying "Plot Set Name must end with .ips". I always forget to add the .ips. I think it would be a good idea that the .ips is autom...
11 months ago in ProjectWise Design Integration 0 Needs review