Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1125

Adding Notification tool on BCC.

Can we get the notification of the activities going on into BCC
about 2 years ago in ProjectWise Components Center / Design System Integration 0 Future consideration

Autotagging for meta data from document name

When uploading a file in BIC via drag and drop (browser) or via PW Drive (rightclick add to PW) the document upload dialogue shows. Depending on the upload folder, some of the fields in the document code tabs are prefilled automatically. We would ...
9 months ago in ProjectWise Design Integration 0 Needs review

External User - default receive package permissions in 365

The current Deliverables Management Default Setting in 365 user management has users set to "Read & Create Draft only" permissions after accepting an invite. This means until the organisation Administrator creates a new role with "Receive" per...
over 1 year ago in Deliverables Management 2 Will not implement

RFI Report - Include Delegated/Additional Responders in RFI Report Tab

The current RFI report only includes the original TO: recipient. Where an RFI is delegated to another user or sent to additional responders, the report only shows the original responder. The raw data export contains some of this information, but i...
over 1 year ago in Deliverables Management 1 Will not implement

Redesign the modify window

The Modify window is due for a redesign to adopt a table style. The header would match the active view, if need more columns could be add. Using and excel sheet on the side. As long as the number of columns and rows match, we could copy and paste ...
9 months ago in ProjectWise Design Integration 0 Needs review

Allow Multiple participant as Additional Reviewer

When we configure the distribution matrix, the documentation mention we can have multiple participants for AR2. However this does not seem possible. Request is to allow the system to be configure this way so we can reduce the number of column used...
9 months ago in Deliverables Management 2 Already exists

Replicate "Add Comment" function from ProjectWise Explorer

The "add comment" in conjunction with the workflow completes our QA process and audit trail. Without this in the web, we cannot completely switch off PWE for approvers.
about 3 years ago in ProjectWise Web & View 0 Needs review

Switch to disable AutoCAD refreshing nested references to speed up loading

Time to open a DWG file in AutoCAD from ProjectWise takes significantly longer when a large number of nested references are present, even if the local cached files are up to date. A Switch to short circuit this process so that the function returns...
over 2 years ago in ProjectWise Design Integration 0 Needs review

Save Projects Sync'd

Is there a way to save synced projects for a user, and then apply the saved sync projects to others users?
9 months ago in ProjectWise Drive 0 Needs review

Attribute Sheets for Multiple Sheet Models/Layouts in 1 DGN/DWG

In the same DGN, there are multiple Drawing or Sheet Models (or multiple layouts in DWG) but only 1 Drawing/Document Attributes in ProjectWise can be used. How to map multiple sheets into PW multiple document/drawing attributes sheet? it is also u...
9 months ago in ProjectWise Design Integration 0 Needs review