Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Deliverables Management

Showing 184 of 1179

Configurable naming / numbering convention aligned to ISO 19650

Transmittal, Issue, RFI, RFA, etc forms should have configurable naming containers which are aligned to Project / Company as well as ISO naming conventions and containers (Project-Originator-Location-Level-Doc Type-Author-number) eg 7001-BBH-ZZ-ZZ...
about 1 year ago in Deliverables Management 0 Future consideration

redesign the select file

The select file window need to b redesign to make it more usable for a day tp day life. example each time we need to tick back the Version and description We cannot change the column layout, we cannot move it on the side. etc.. Use a saved search ...
5 months ago in Deliverables Management 2 Future consideration

Add note when we revise a transmission

When we revise a transmission, we have no place to add internal notes or comments Example I see the version is not correct and a new document should be add instead
5 months ago in Deliverables Management 1 Needs review

Add new version

When we manually add new version to a document. PWDM bring us back to the top of the list of the document. For a transmission having 10 documents it is OK, but for a transmission having 200+ documents we are force to make a back an forth between t...
5 months ago in Deliverables Management 1 Needs review

general Correspondence comment

When we add a comment under the general tab The format of the paragraph is not maintain Which lead to a single paragraph, that looks like a long sentence. really hard to read Request is to have the paragraph return to be supported
over 1 year ago in Deliverables Management 1 Will not implement

Recalling a responded/closed transmittal must require confirmation first from the recipient before it proceed

It is understandable that there may be cases wherein responded/closed Transmittal might still need to be recalled, but said recall must be agreed first by both the sender and the recipient. This can be done by adding the process wherein the recipi...
over 1 year ago in Deliverables Management 3 Future consideration

Change Role Between MR and AR

We have situations where a Main Reviewer (MR) need to become Additional Reviewer (AR) We do not seems to have an easy way of doing this. We do not seems to be able to delegate as both users are MR on the same transmission. A MR1 should be able to ...
10 months ago in Deliverables Management 2 Will not implement

Unlock a response should unlock the issue

When we send a response and ask to unlock that response. The issue attach to the document cannot be edit .
5 months ago in Deliverables Management 0 Needs review

Identify open issue

From the Incoming or Outgoing We need a quick way to see which transmission has open issue and the state or the issue,
5 months ago in Deliverables Management 0 Needs review

Show response into document attribute and other info

The system can push a document response to an attribute. Request is to have the possibility to manually push the response rather than wait for the system. Also we would like to push other info like the transmission number so we could search from w...
11 months ago in Deliverables Management 1 Needs review